كورس دراسة فروق الأسعار فى مجال المقاولات
1 × 6,825 ج.م
Delay analysis for EOT Claims (English Version)
Delay analysis for EOT Claims
Course breif
The course present a simplified explanation of all the analysis methods used for delay analysis and determining the responsibility of each party in the contract practically. We will also cover some theoretical concepts that are essential in job interviews as well as during meetings.
Delay analysis methods have more than one school, and by the end of the course, you will know how to analyze through the SCL (Society of Construction Law), which is the most famous in the Gulf market especially, and the AACE-RP school. The RP study aims to provide a more comprehensive and broader clarification, but in the end, the methods are quite similar in both schools.
Target Audience
- Planning engineers withat least 5 years of experience in the field of planning and monitoring.
- The training program is not suitable for contract engineers but for planning specifically.
Requirements to know before starting the course:
- The trainee should have attempted or participated in at least one or two claims during their professional career for extending project time.
- The trainee should have sufficient experience working with Primavera software.
- It’s not a requirement to have sufficient knowledge of contracts.
Skills Acquired by the end of the course:
- Understanding different analysis methods used in the market through RP.
- Understanding analysis methods used in the market through SCL.
- If you were a consulting engineer, you would know how to analyze claims submitted by the contractor.
- If you work with the contractor, you will know how to prepare a claim and its proper components.
- Knowing what should be reviewed in the schedule before submitting it as a contractor and after submitting it as a consultant
Used programs:
- Primavera P6.
- MS Office.
Course Topics:
- We’ll delve into the intricacies of Forensic Delay Analysis.
- We’ll elucidate the disparities between Forensic Analysis and Schedule Planning.
- Exploring the concept of fragnet and its correct application in analysis will be a focal point.
- You’ll be acquainted with the three fundamental steps in studying any delay.
- Varieties of delays and their classifications will be thoroughly explained.
- A comprehensive understanding of concurrent delays and practical calculation methods will be provided.
- You’ll gain insight into different types of concurrent delays and the circumstances under which the contractor is compensated.
- We’ll guide you through the life cycle of an Extension of Time claim.
- Three distinct schedule types essential for delay analysis will be introduced.
- Simplified explanations of TIA (Time Impact Analysis) and window analysis will be provided.
- We’ll clarify the concept of AACE RP and highlight the variances between SCL and RP methodologies for delay analysis.
- Familiarize yourself with the 9+1 methods of delay analysis and the criteria for selecting each method.
- Understanding the preferred method for analysis and the rationale behind it will be emphasized.
- Step-by-step instructions for drafting a claim will be provided.
- Guidance on reviewing and analyzing a submitted claim will be offered.
- Differentiating between Modelled and Observational methods of analysis will be elucidated.
- We’ll outline the preparatory steps a consultant should take before conducting an analysis.
- Understanding the 14 key checkpoints as per DCMA standards will be emphasized.
About Instructor:
Eng. Nazih Sfier
Planning Manager
- Graduated from Cairo university with more than 17 years experience in golf contries in porject management
- Hold PMP – PMI-RMP
Course Reviews
الأسئلة الشائعة عن الكورس
لا، لا يلزم أي حضور مباشر أو التزام بمواعيد ثابتة. جميع الكورسات والدبلومات مسجلة بالكامل بجودة عالية ، مما يتيح لك مرونة تامة في المشاهدة والدراسة في أي وقت ومن أي مكان يناسبك.
كل الداتا مرفوعة على الكلاود الخاص بينا وبتقدر تحملها تحميل مباشر بعد الإشتراك في الكورس.
في نهاية إجتيازك للكورس هتحصل علي شهادة معتمدة من اكاديمية مدني ستور
نوفر طرق دفع متعددة وميسرة لتناسب جميع المهندسين في الوطن العربي والعالم، وتشمل الدفع الإلكتروني المباشر عبر بطاقات الفيزا، الماستركارد، التحويل البنكي، أو انستاباي او تحويل المحافظ لعملائنا داخل مصر.
رخصة تشغيل الكورس أو الدبلومة مخصصة للعمل على جهاز كمبيوتر أو لابتوب واحد فقط لحفظ الحقوق. وفي حال تلف جهازك ، يمكنك دائماً التواصل مع الدعم الفني لإلغاء الترخيص القديم وتفعيل ترخيص جديد لجهازك مجاناً .













